Check the installed modules, supported type and population rules.
Use this checklist to describe the change. The host system and full configuration determine which parts will fit.
03
YOUR QUOTE REQUEST
Tell us what you need
Add the quantity, options and installation details you want us to quote.
Confirm the exact manufacturer part number, host compatibility and included components. Optional software is quoted separately only when requested.
04
SUPPORT & REPLACEMENT
Plan for support and future replacement
Check support dates, replacement options and whether continued use still makes sense.
Support dates
We do not have confirmed sales and support dates for this part number.
Send us the full NX-1165-G9-4410T-CM order code, software release and support details before planning long-term use.
Ask us to check the current sales and support status
Choosing a replacement
Products with similar names or connectors may still be incompatible. Compare the full specifications, installed system and software requirements.
Compare related products These products may be related, but we have not confirmed them as replacements.What should I compare?
Physical fit, connectors and power
Capacity and required performance
Software, firmware and feature support
Licensing, service coverage and data and configuration migration
USING HARDWARE RESPONSIBLY
Maintain, redeploy or replace
Consider repairability, remaining support and actual operating demand. Extending service life is useful only when the equipment still meets your security and reliability requirements.
MaintainCheck parts, firmware and service options.
RedeployMatch a suitable role and securely erase any retained data.
Retire responsiblyUse documented data removal and an appropriate electronics recycler.
Compare operating energy
Use measured average input power for the same workload. PSU ratings and processor TDP are different from total system power.
Energy difference = (current W − proposed W) × hours × units ÷ 1,000. Excludes cooling, embodied emissions and purchase costs.
CONNECTION DETAILS
Network and storage connections
Choose the host adapters around the workload and the storage protocol. A server NIC, Fibre Channel HBA and SAS HBA serve different connections.
CONNECTS TOUsers & application traffic
→
NX-1165-G9-4410T-CMHyperconverged server systems
→
USED FORNetwork and storage services
What to check before installation
Qualified adapters, slots, drivers and optics
Network paths, storage protocol and operating system
Browse the categories above for related equipment, then send us the full configuration so we can check the fit.
PRODUCT DETAILS
Features and applications
Product details
Nutanix NX-1165-G9-4410T-CM hyperconverged server configuration. Named platform: NX-1165-G9; nodes in ordering configuration: 1 Node; processor per node: 2 × Intel Xeon-Silver 4410T; cores per processor: 10-core.
Plan the full Nutanix configuration
The stated node count and processors identify this ordering configuration. Memory, drive population, adapters, software subscriptions and support must be specified in the quotation. Do not treat an appliance code as proof that all these options are included.
Cluster expansion and installation
For an existing cluster, provide the NX model, generation, AOS and hypervisor releases, node roles and current capacity. Check hardware compatibility, supported cluster layout, rack depth, power feeds and network design before deployment.
Processors and nodes
Processor quantities are stated per node; the node count refers to the ordering configuration. Installed memory and usable storage are not specified by this P/N alone. Do not read processor figures as totals for a populated cluster.
Ordering the correct option
This page identifies the Nutanix ordering option. Component-vendor names do not replace the Nutanix P/N. Confirm the exact offered label, assembly and contents before ordering.
Availability and quotation
Some Nutanix options must be ordered with an eligible system or supported upgrade. Send the complete P/N, host model, generation, quantity and required delivery date. We confirm ordering eligibility, condition, supplied components, software, support and the final amount before bank transfer.