Tell us which system or service this product is for. We do not have details for this section yet.
Loading products and specifications…
Loading products and specifications…

Match the accelerator to the host
NVIDIA GB200 NVL72. Rack-scale AI System. Ask for current pricing and help choosing the right configuration.
Tell us the configuration, quantity and destination. Your quotation will show availability, condition, warranty and delivery terms.
Start an order requestNVIDIA / PRODUCT DETAILS
A matching connector is only one part of qualification. Check the physical package, power, cooling and software together.
Tell us which system or service this product is for. We do not have details for this section yet.
Tell us which system or service this product is for. We do not have details for this section yet.
Tell us which system or service this product is for. We do not have details for this section yet.
Match memory capacity and supported compute functions to the software workload.
View all specifications →NVIDIA / ORDER & INSTALLATION DETAILS
Distinguish a GPU board, accelerator module and complete NVIDIA system.
Check the qualified host, original power arrangement and cooling.
Review the driver or compute stack and required interconnect components.
Technical overview
Use the full part number when comparing options or asking about system fit.
| Product series | Rack-Scale AI Systems |
|---|---|
| Brand | NVIDIA |
| Model | GB200 NVL72 |
| Catalog line | NVIDIA GB NVL Systems |
| Manufacturer | NVIDIA |
| Model / P/N | NVIDIA GB200 NVL72 |
| Category | Rack-scale AI System |
| Product family | NVIDIA GB NVL Systems |
HOW THIS PRODUCT FITS YOUR SYSTEM
Choose how you plan to use this product.
Match memory capacity and supported compute functions to the software workload.
Confirm the qualified chassis, carrier, riser and interconnect requirements.
Use this checklist to describe the change. The host system and full configuration determine which parts will fit.
YOUR QUOTE REQUEST
Add the quantity, options and installation details you want us to quote.
Confirm the exact manufacturer part number, host compatibility and included components. Optional software is quoted separately only when requested.
SUPPORT & REPLACEMENT
Check support dates, replacement options and whether continued use still makes sense.
We do not have confirmed sales and support dates for this part number.
Send us the full GB200 NVL72 order code, software release and support details before planning long-term use.
Ask us to check the current sales and support statusProducts with similar names or connectors may still be incompatible. Compare the full specifications, installed system and software requirements.
Compare related products These products may be related, but we have not confirmed them as replacements.USING HARDWARE RESPONSIBLY
Consider repairability, remaining support and actual operating demand. Extending service life is useful only when the equipment still meets your security and reliability requirements.
Use measured average input power for the same workload. PSU ratings and processor TDP are different from total system power.
Energy difference = (current W − proposed W) × hours × units ÷ 1,000. Excludes cooling, embodied emissions and purchase costs.CONNECTION DETAILS
Choose the host adapters around the workload and the storage protocol. A server NIC, Fibre Channel HBA and SAS HBA serve different connections.
Browse the categories above for related equipment, then send us the full configuration so we can check the fit.
PRODUCT DETAILS
See the product details and images below.
Rack-scale AI system planning
Add this product to your request ↗Platform overview
This page separates the server platform from the options that complete it. No processor, DIMM, drive, controller, adapter or service item is treated as interchangeable until its fit is checked against the model.
Chassis revision, regional SKU and current sales and support status are confirmed before parts are selected.
Processor family, socket count, thermal limits and memory population are checked together for the selected platform.
Drive media, form factor, backplane, controller or HBA, cabling and boot design are reviewed together.
NICs, accelerators, risers, power, firmware, rails, support and regional accessories are listed separately in the BOM.
Complete systems and spare parts are quoted separately. CPUs, DIMMs, drive carriers, controllers, NICs and PSUs are matched to the selected platform unless an approved compatible alternative is listed in the quotation.
Rack-scale AI system planning
Rack arrangement, power, cooling method and installation context
Software baseline, orchestration, acceptance and operational handover
Accelerator, adapter or DPU; exact board code and supported host.
Switch or computing system; its own SKU, firmware and configuration.
Product and edition; deployment rights and support where applicable.
Where NVIDIA lists both a current SKU and legacy Mellanox OPN, retain their exact documented mapping. A family name does not confirm a port layout, GPU board version or software entitlement.
Rack integration plan
Star Networking reviews upstream switching, storage path, OOB management, power input, rails and service details together so the delivered node can be installed without reworking the BOM.
25/100/400G uplinks, DAC/AOC, optics and OOB management are planned before shipment.
NVIDIA GB200 NVL72 is staged with CPU, DIMM, storage, controller, NIC, PSU and firmware profile.
Boot media, hot data tier, capacity tier and backup path are separated in the BOM.
Service terms, serial numbers, labels, packing details and delivery milestones are recorded with the order.
Deployment / workload
Choose platform options and confirm the operating environment before finalizing the design.
Balance core density, memory capacity, boot resilience, east-west traffic and support policy.
Align memory, storage latency, controller mode and network throughput with the application profile.
Plan resilient boot, management access, power redundancy and a repeatable firmware baseline.
Validate host CPUs, memory, accelerator topology, fabric, power, cooling and software as one system design.
Compatibility and BOM checks
Choose up to 3 products
01 / Application planning
Match the option, spare or assembly number and the relevant hardware revision.
Review the host, connectors, physical fit and dependencies as one configuration.
Keep quantities, included kits and target systems attached to each BOM line.
02 / Inspection & testing
Agree the inspection and test scope for the offered condition before confirming the order.
03 / Packing & international delivery
Confirm the packing list, delivery address and receiving requirements before shipment.
Protect
Specify packing around the component, its sensitivity and the quantity ordered.
Prepare
Select packing suitable for the hardware, combined order and transport route.
Deliver
Confirm the destination and shipment scope before arranging collection.
Send the country, postal code, requested date and receiving restrictions with your enquiry. Packing, freight and delivery timing are confirmed in the written quotation.
Shipping guide ↗04 / Warranty & after-sales
Keep the warranty terms with the part number and supplied condition. The quotation or order defines the applicable coverage for your item.
Warranty & RMA guide ↗Include the product label, order reference and a description of the fault.
Provide the requested identification and diagnostic details.
Agree the authorized next step before shipping a return.
Repair, replacement or other remedies depend on the agreed warranty terms and the fault assessment.
Prepare the next step
Include quantities, destination, test evidence and warranty requirements.
Model selection & order planning
NVIDIA GB200 NVL72
Before you request a quote
Include the full model, manufacturer P/N, revision and quantity.
Tell us the host model, generation, installed configuration and required supporting hardware.
Specify condition, testing requirements, destination and requested delivery date.